Legal Compliance65/100
The tender defines a Restricted procedure and provides a reasonable submission timeframe from today's date. However, the absence of a reveal date, explicit mandatory exclusion grounds, and specified evaluation criteria are significant legal compliance shortcomings.
•Missing reveal date
•No explicit mandatory exclusion grounds provided
Clarity60/100
The description of the scope and the division into Lots is clear, and the AI-extracted technical requirements are well-articulated. Nevertheless, the complete absence of evaluation criteria severely compromises the clarity for potential bidders regarding how their submissions will be assessed.
•No evaluation criteria specified
Completeness70/100
Basic information, estimated value, duration, and CPV codes are provided. However, the tender is incomplete due to the lack of explicit evaluation criteria, mandatory exclusion grounds, and detailed financial requirements beyond an implicit capacity.
•Missing evaluation criteria
•No explicit mandatory exclusion grounds
Fairness35/100
The 'Restricted' procedure inherently limits competition. Furthermore, the requirements for 'Bespoke Electronic Communications Network (ECN) Harnesses' with a pre-verified design, combined with the complete absence of evaluation criteria and no e-submission, strongly suggest potential tailoring towards specific, pre-qualified suppliers, significantly undermining fairness and transparency.
•No evaluation criteria specified, compromising objectivity
•No e-submission, limiting equal access
Practicality35/100
The lack of electronic submission is a practical drawback. Critically, the contract start date being identical to the submission deadline is a fundamental and impractical error, making the stated timeline unworkable for evaluation and award processes.
•No e-submission supported
•Contract start date is identical to the submission deadline, which is impractical and likely incorrect.
Data Consistency40/100
There are significant data inconsistencies, most notably the contract start date being the same as the submission deadline. Additionally, there is a discrepancy in the estimated value between the basic information (EUR) and the document summary (GBP). The 'Liable Person' field is also empty.
•Contract start date is identical to the submission deadline
•Currency inconsistency in estimated value (EUR vs. GBP in document summary)
Sustainability25/100
The tender information provides no indication of green procurement, social aspects, or innovation focus. It is also not EU funded, which often correlates with higher sustainability standards.
•Not green procurement
•No social criteria