Renovation of water supply networks using the bursting method in Riga, in the neighbourhoods of Āgenskalns, Torņakalns, Jugla and Zasulauks

Tender Overview

ORGANIZATION

SIA "Rīgas ūdens"

LOCATION

Riga, Latvia

VALUE

Not disclosed

DEADLINE

February 11, 2026 at 10:00

CATEGORY

Other

CPV CODE

45231300

REFERENCE

161320

Project Timeline

Contact Information

View Original

Original Tender Description

Renovation of water supply networks using the bursting method in Riga, in the neighbourhoods of Āgenskalns, Torņakalns, Jugla and Zasulauks
⚠️

MANDATORY EXCLUSION GROUNDS

  • Comply with all specified exclusion criteria outlined in the tender documents for each part.

Requirements Preview

Sign up to view complete requirements and analysis

AI-powered requirement analysis
Complete compliance breakdown
Strategic bidding insights
Instant eligibility check

No credit card required • Setup in 2 minutes

DOC
10.pielikums – Konfidencialitātes apliecinājuma veidne
actual10.pielikums – Konfidencialitātes apliec...58.1 KB
Summary:
This document is Appendix 10, a template for a Confidentiality Statement required from interested suppliers. By signing this statement, the supplier acknowledges receipt of confidential network schemes ("Shēmas") pertaining to the tender. The supplier commits to maintaining strict confidentiality of this information, ensuring their employees also adhere to these terms, and agrees to cover any losses incurred by the client due to a breach of confidentiality. This form must be completed and submitted as part of the tender response.
DOC
11.1.pielikums – Atjaunojamo tīklu shēma 1.daļai
actual11.1.pielikums – Atjaunojamo tīklu shēma...4.4 MB
Summary:
Document: 11.1.pielikums – Atjaunojamo tīklu shēma 1.daļai. AI analysis could not be completed.
DOC
11.2.pielikums – Atjaunojamo tīklu shēmas 2.daļai
actual11.2.pielikums – Atjaunojamo tīklu shēma...3.1 MB
Summary:
Document: 11.2.pielikums – Atjaunojamo tīklu shēmas 2.daļai. AI analysis could not be completed.
DOC
11.3.pielikums – Atjaunojamo tīklu shēma 3.daļai
actual11.3.pielikums – Atjaunojamo tīklu shēma...4.1 MB
Summary:
Document: 11.3.pielikums – Atjaunojamo tīklu shēma 3.daļai. AI analysis could not be completed.
DOC
11.4.pielikums – Atjaunojamo tīklu shēma 4.daļai
actual11.4.pielikums – Atjaunojamo tīklu shēma...833.8 KB
Summary:
Document: 11.4.pielikums – Atjaunojamo tīklu shēma 4.daļai. AI analysis could not be completed.
DOC
11.5.pielikums – Atjaunojamo tīklu shēma 5.daļai
actual11.5.pielikums – Atjaunojamo tīklu shēma...732.3 KB
Summary:
Document: 11.5.pielikums – Atjaunojamo tīklu shēma 5.daļai. AI analysis could not be completed.
DOC
9.1.pielikums – Tehniskā specifikācija – darba uzdevums 1.daļai
actual9.1.pielikums – Tehniskā specifikācija –...275.7 KB
Summary:
This technical specification details the scope of work for the renovation of water pipeline networks in Riga using the pipe-bursting method, specifically for DN300 mm and DN100 mm polyethylene pipes. It outlines extensive general requirements covering site management, traffic organization, environmental protection, and damage prevention. Furthermore, it specifies mandatory pre-construction documentation, detailed as-built measurement guidelines adhering to Latvian construction norms, and rigorous testing procedures for hydraulic integrity, disinfection, and soil compaction.
DOC
9.2.pielikums – Tehniskā specifikācija – darba uzdevums 2.daļai
actual9.2.pielikums – Tehniskā specifikācija –...275.6 KB
Summary:
This document is a technical specification outlining the scope of work for the renovation of approximately 460m of DN100mm water pipeline in Riga using a trenchless method. It details specific requirements for materials, construction processes, site management, environmental protection, and safety. Bidders must adhere to strict guidelines for road surface restoration, traffic organization, utility protection, and comprehensive as-built documentation, including geodetic surveys and photographic evidence.
DOC
9.3.pielikums – Tehniskā specifikācija – darba uzdevums 3.daļai
actual9.3.pielikums – Tehniskā specifikācija –...274.9 KB
Summary:
This document is the Technical Specification and Scope of Work for the renovation of approximately 360 meters of DN100 mm water pipeline in Riga, utilizing a pipe-bursting method to install new DN/OD 160mm PE100-RC PN10 polyethylene pipes. It details comprehensive requirements for construction execution, site management, environmental protection, traffic organization, and utility protection. The specification also mandates extensive documentation, including pre-construction reports, detailed photo fixation, certified geodetic as-built surveys, and various tests such as hydraulic pressure, disinfection, and multi-layered soil compaction.
DOC
9.4.pielikums – Tehniskā specifikācija – darba uzdevums 4.daļai
actual9.4.pielikums – Tehniskā specifikācija –...275.6 KB
Summary:
This document outlines the technical specifications and scope of work for the renovation of approximately 265m of DN100 mm water pipeline in Riga using the destruction method, replacing it with DN/OD 110mm PE100-RC, PN10 polyethylene pipes. It details comprehensive requirements for work execution, site management, environmental protection, documentation, and testing, including hydraulic tests, disinfection, and soil compaction. Bidders must adhere to strict standards for road restoration, utility protection, and as-built plan submission, bearing all associated costs.
DOC
9.5.pielikums – Tehniskā specifikācija – darba uzdevums 5.daļai
actual9.5.pielikums – Tehniskā specifikācija –...275.6 KB
Summary:
This document outlines the technical specifications and work assignment for the renovation of approximately 216 meters of DN300 mm water pipeline in Riga using the pipe bursting method. It details the scope of work, general requirements, environmental management, utility protection, and specific procedures for execution, including strict documentation, testing, and as-built measurement guidelines. The contractor is responsible for all aspects of the project, ensuring compliance with Latvian and international standards, and coordinating with relevant authorities.
DOC
Iepirkuma priekšmeta 1.daļas prasības, 1.versija
actualIepirkuma priekšmeta 1.daļas prasības, 1...100.3 KB
Summary:
This document outlines the specific requirements for Part 1 of the tender 'Water pipeline network renovation using the destruction method in Riga'. It details the exclusion and selection criteria, including requirements for bidder registration, financial standing, experience, and key personnel. Furthermore, it specifies the content for technical and financial proposals, referencing various annexes and templates, and states that the lowest price will be the evaluation criterion.
DOC
Iepirkuma priekšmeta 2.daļas prasības, 1.versija
actualIepirkuma priekšmeta 2.daļas prasības, 1...100.0 KB
Summary:
This document details the comprehensive requirements for submitting a bid for Part 2 of the tender concerning the renovation of water supply networks in Riga, Buru and Laivu streets. It outlines exclusion criteria, selection requirements for bidder qualifications (including registration, financial standing, experience, and key personnel), technical proposal content, and financial proposal submission guidelines. The tender will be evaluated solely based on the lowest price without VAT.
DOC
Iepirkuma priekšmeta 3.daļas prasības, 1.versija
actualIepirkuma priekšmeta 3.daļas prasības, 1...100.0 KB
Summary:
This document details the specific requirements for Part 3 of the "Water pipeline network renovation" tender in Riga, focusing on Veldres and Lilastes streets. It outlines mandatory exclusion and selection criteria for bidders, including financial standing, relevant experience, and the availability of qualified key personnel. Bidders must submit comprehensive technical and financial proposals using provided templates, with the tender evaluation based solely on the lowest price without VAT.
DOC
Iepirkuma priekšmeta 4.daļas prasības, 1.versija
actualIepirkuma priekšmeta 4.daļas prasības, 1...100.0 KB
Summary:
This document outlines the detailed requirements for Part 4 of the tender "Water pipeline network renovation using trenchless method in Riga, Valentīna street." It specifies exclusion and selection criteria for bidders, including requirements for registration, financial standing, experience, and key personnel. Furthermore, it details the mandatory components of the technical and financial offers, emphasizing the submission of specific forms and templates, and states that the lowest price without VAT will be the sole evaluation criterion.
DOC
Iepirkuma priekšmeta 5.daļas prasības, 1.versija
actualIepirkuma priekšmeta 5.daļas prasības, 1...100.0 KB
Summary:
This document outlines the comprehensive requirements for Part 5 of the "Water pipeline network renovation" tender by SIA "Rīgas ūdens". It details the exclusion and selection criteria, including requirements for tenderer registration, financial standing, professional experience, and the availability of key personnel. Bidders must submit a detailed technical proposal, a financial proposal using provided templates, and tender security, with evaluation based solely on the lowest price without VAT.
DOC
Nolikums
actualNolikums874.2 KB
Summary:
This tender document outlines the requirements for an open competition organized by SIA "Rīgas ūdens" for the renovation of water supply networks using the pipe bursting method in various Riga neighborhoods. The project is divided into five parts, with contracts awarded based on the lowest price (excluding VAT) for each part. Bidders must submit their proposals electronically via the EIS e-konkursu subsystem, including a mandatory bid security and demonstrating compliance with specified qualification criteria.

Documents Preview

Sign up to view document summaries and analysis

AI document summaries
Key requirement extraction
Risk & compliance alerts
Strategic document insights

No credit card required • Setup in 2 minutes

63
Good

Tender Quality Score

This tender suffers from a critical lack of publicly accessible documentation, making a comprehensive quality assessment impossible and raising significant concerns regarding transparency and fairness for potential bidders.

Score Breakdown

Legal Compliance100/100

While basic tender information is present, the complete absence of publicly accessible tender documents and evaluation criteria severely hinders the ability to assess full legal compliance, particularly regarding transparency and equal treatment principles.

Restricted document access
No document content available
Clarity40/100

The basic description of the works is clear, but the complete lack of tender documents means that specific requirements, technical specifications, and contractual terms, which are crucial for clarity, are entirely unavailable to potential bidders.

No documents attached
No document content available
Completeness75/100

The tender is critically incomplete due to the absence of any attached documents, detailed requirements beyond mandatory exclusion grounds, and evaluation criteria. The estimated value is also not disclosed.

No documents attached
No document content available
Fairness40/100

The restricted document access and complete lack of detailed information create a significant barrier to fair competition. Potential bidders cannot adequately prepare proposals or understand the full scope, potentially favoring entities with prior knowledge or privileged access, which could indicate tailoring.

Restricted document access
No document content available
Practicality40/100

From a practical standpoint, it is impossible for interested parties to prepare a compliant and competitive bid without access to the tender documents, technical specifications, and submission instructions.

No documents attached
No document content available
Data Consistency100/100

The limited basic information provided (title, reference, organization, description) appears consistent. However, the absence of detailed documents prevents any deeper assessment of consistency within the tender package.

Sustainability0/100

The tender does not indicate any specific green procurement requirements or sustainability considerations, as flagged by the automated check.

Not green procurement

Strengths

Has title and reference number
Organization and description provided
Deadline specified and reasonable
CPV code provided
Mandatory exclusion grounds mentioned

Concerns

Restricted document access and no document content available
Missing evaluation criteria and estimated value
Lack of transparency hindering fair competition
No e-submission option
No sustainability considerations

Recommendations

1. Immediately publish all tender documents and specifications
2. Disclose the estimated contract value and detailed evaluation criteria
3. Ensure an accessible e-submission platform is available

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes

Generate DocumentsReview Documents
B
Tender Quality Score
63/ 100 · Good

Tender Assistant

Ask me anything about this tender

Tender Assistant

Hello! I'm your AI assistant for this tender. I can help you understand requirements, deadlines, eligibility criteria, and provide strategic insights.

What are the main requirements?
When is the deadline?
Who is eligible to bid?

No credit card required

Setup in 2 minutes

Save with Notes