Skip to main content
Retour aux appels d'offres

Construction de Logements Bas Carbone Hors Site par MMC - DPS Sud-Ouest

Ouvert
Date limite
2009 jours restants
Septembre 26, 2031
Détails du contrat
Catégorie
Restricted Procedure
Référence
014059-2021
Valeur
£1,125,000,000
Lieu
South West England, Royaume-Uni
Publié
Mars 19, 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Juin 21, 2021

Date limite pour les questions

Septembre 19, 2031

Date limite de soumission

Septembre 26, 2031

Date de début du contrat

Septembre 26, 2021

Intelligence acheteurPRO
🔒
Débloquer l'intelligence acheteur
Consultez les modèles de dépenses, les procédures préférées et plus encore.
Passer au Professionnel →
Budget
£1,125,000,000
Durée
120 mois
Lieu
South West England
Type
Restricted Procedure
71
Score de qualité/100
Bon

Description originale de l'appel d'offres

Le London Housing Consortium (LHC) (agissant en tant qu'Organisme Central d'Achat pour le South West Procurement Alliance (SWPA)) consulte sur la création potentielle d'un Accord DPS pour la construction de logements résidentiels (y compris tous les bâtiments et installations communautaires associés) intégrant des systèmes hors site à faible consommation d'énergie dans tout le Sud-Ouest. Le DPS vise à fournir des logements hors site / MMC, des appartements, des maisons de retraite et des logements multi-occupants, y compris des solutions zéro carbone. Ce processus de candidature au DPS se déroulera en parallèle avec une nouvelle boîte à outils numérique de Constructing Modern Methods (CMM). Le CMM a été développé comme un concept dans une recherche antérieure financée par la Local Government Association et menée avec le Bristol City Council (BCC) et le Bristol Housing Festival (BHF) pour comprendre quelles ressources pourraient rendre plus réalisable l'adoption à grande échelle des méthodes de construction modernes et des solutions de logement hors site. Les candidats devront s'enregistrer en tant que fournisseur sur le portail d'e-tendering de la SWPA, ProContract, avant de pouvoir postuler au DPS. Une fois enregistrés, les candidats devront s'assurer qu'ils sont connectés et cliquer sur le lien DPS approprié dans la liste des opportunités en filtrant par 'organisations' et en sélectionnant LHC. Une fois entrés dans le DPS Low Carbon Offsite Construction, le candidat devra cliquer sur 'enregistrer l'intérêt pour cette opportunité'.
Achats écologiques

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

1 exigences dans 1 catégories

Obligatoire (1)
MANDATORY EXCLUSION GROUNDS1
--No mandatory exclusion grounds are explicitly detailed in the provided information.

Aperçu des exigences

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Documents

1 documents disponibles avec des résumés IA

Official PDF VersionPDF
014059-2021_official.pdf

This document is a contract notice for a Dynamic Purchasing System (DPS) seeking suppliers for low carbon offsite Modern Methods of Construction (MMC) housing in the South West, requiring registration on SWPA's ProContract portal to apply.

Aperçu des documents

Inscrivez-vous pour consulter les résumés et l'analyse des documents

71
Bon

Score de qualité de l'appel d'offres

This tender outlines a high-value, long-term Dynamic Purchasing System (DPS) for innovative low-carbon housing, but its critical lack of documentation and fundamental procedural inconsistencies raise significant concerns regarding transparency, fairness, and legal compliance.

Répartition du score

Conformité légale100/100

A major legal inconsistency exists as the tender is classified as 'Restricted' procedure, yet the description clearly outlines the establishment of a 'DPS Agreement'. DPS is an open procedure for qualification, fundamentally different from a restricted procedure. Furthermore, the tender explicitly mentions 'MANDATORY EXCLUSION GROUNDS' but states that none are explicitly detailed, which is a critical omission for legal compliance.

Inconsistent procurement procedure type (Restricted vs. DPS Agreement)
Absence of explicitly detailed mandatory exclusion grounds
Clarté40/100

While the overall strategic intent and the registration process via ProContract are reasonably clear, the complete absence of any tender documents (specifications, terms, evaluation criteria) makes it impossible to assess the clarity of actual requirements. The procedural inconsistency further introduces significant ambiguity for potential bidders.

Ambiguity regarding the actual procurement procedure type
Lack of detailed information due to missing tender documents
Exhaustivité83/100

This tender is critically incomplete. The total absence of any tender documents, including detailed specifications, terms and conditions, evaluation criteria, and full legal requirements (such as explicit exclusion grounds), renders it impossible for any bidder to prepare a compliant submission. This is the most significant deficiency.

Complete absence of all tender documents
Missing detailed specifications and scope of work
Équité80/100

The complete lack of tender documents, detailed requirements, and evaluation criteria severely compromises the principles of fairness and equal treatment. Bidders cannot understand the basis for selection or prepare competitive proposals. The mention of CMM developed with specific entities (BCC, BHF) could, in the absence of full transparency, raise questions about potential tailoring, though this cannot be confirmed without documentation.

Lack of transparency and equal treatment due to missing documents
Potential for perceived tailoring or preferential knowledge (CMM mention) without full documentation
Aspect pratique40/100

From a practical standpoint, this tender is unworkable for bidders. Without any documents detailing the requirements, specifications, or submission process beyond basic registration, it is impossible for potential suppliers to prepare or submit a meaningful application to the DPS.

Impractical for bidders to respond without any tender documentation
Inability to assess technical feasibility or operational requirements
Cohérence des données100/100

Significant data inconsistencies are present. The tender states 'Restricted' procedure but describes a 'DPS Agreement'. The automated check flags 'No e-submission' while the description explicitly mentions an 'eTendering portal, ProContract'. Furthermore, the 'Not green procurement' flag contradicts the tender's explicit focus on 'Low Carbon' and 'zero carbon solutions'.

Inconsistency between stated procedure type and description
Contradiction regarding e-submission method
Durabilité25/100

The tender's description clearly highlights a strong focus on environmental sustainability, specifically 'Low Carbon Offsite MMC Housing Construction' and 'zero carbon solutions'. This aligns with modern procurement best practices. However, the automated check flagging 'Not green procurement' is a direct contradiction that needs immediate clarification, likely stemming from the absence of detailed green criteria within the missing documents.

Contradiction between stated 'Low Carbon' focus and automated 'Not green procurement' flag

Points forts

Clear strategic focus on innovation and environmental sustainability (low carbon, MMC)
High estimated value and long contract duration indicate significant market opportunity
Utilizes an eTendering portal (ProContract) for supplier registration
Addresses a critical need for modern, sustainable housing solutions

Préoccupations

Critical absence of all tender documents (specifications, terms, evaluation criteria)
Fundamental inconsistency between 'Restricted' procedure and 'DPS Agreement'
Missing explicit mandatory exclusion grounds despite being listed as a requirement
Significant contradictions in automated checks versus tender description (e-submission, green procurement)
Potential for perceived tailoring due to CMM/BCC/BHF mention, unverified without full documentation

Recommandations

1. Immediately publish all essential tender documents, including full specifications, terms and conditions, and detailed evaluation criteria.
2. Clarify and correct the stated procurement procedure (Restricted vs. DPS) to ensure legal compliance and transparency.
3. Explicitly detail all mandatory and discretionary exclusion grounds to ensure legal certainty and fairness.

Aperçu de la notation IA

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Analyse complète du score de qualité
Répartition détaillée des sous-scores
Aperçu des forces et des préoccupations
Recommandations stratégiques

Aucune carte de crédit requise • Configuration en 2 minutes

Ajouter au Pipeline