Original Tender Description

Works Specification & Tender Summary Changing Rooms Refurbishment - Cornmill Lane, Tutbury Location: Changing Rooms, Cornmill Lane, Tutbury, Staffs, DE13 9HA Client: Tutbury Parish Council ________________________________________ 1. Project Objective The project comprises of the refurbishment of the existing football changing room facilities to improve privacy, hygiene, accessibility, and energy efficiency. Works include replacing communal shower areas with individual cubicles, upgrading internal finishes, and renewing mechanical and electrical services. The building structure (walls, foundations, and roof) has been inspected and is confirmed to be structurally sound. No structural alterations are included within this contract. ________________________________________ 2. Programme, Access & Constraints Due to a scheduled event taking place between 19-21 June 2026, all site works must commence after this period. The facilities are actively used by football teams, predominantly at weekends. Contractors must: • Minimise disruption to matches and training • Manage access to the car park carefully • Where possible, programme works outside the main football season A detailed programme showing sequencing and access management must be provided with the tender. ________________________________________ 3. Tender Submission & Assessment Tenders must be submitted electronically by email within 30 days of publication of the tender notice. Tenders will be evaluated by a panel comprising of Parish Councillors and the Parish Clerk. Where minor omissions are identified consistently across submissions, tenderers may be asked to provide clarification by a fixed deadline. No changes to price or material elements will be permitted. ________________________________________ 4. Conflicts of Interest Tenderers must declare any actual or potential conflicts of interest, including: • Financial interests relating to Tutbury Parish Council • Personal or business relationships with serving councillors or officers Failure to declare conflicts may result in exclusion. ________________________________________ 5. Contract Award & Payment Terms All tenderers will be notified of the outcome by email. An award notice will be published within 30 days of contract award. Payment terms are 30 days. The Council will retain 5% of the contract value: • 2.5% released at practical completion • 2.5% released following completion of all snagging items ________________________________________ 6. Scope of Works (Refurbishment Only) 6.1 Demolition & Strip-Out • Removal of existing fittings and finishes • Removal of fluorescent lighting and redundant electrical items • Removal of electric panel and fan heaters • Removal of existing floor finishes (approx. 120 m²) • Removal of communal shower partitions and fittings ________________________________________ 6.2 Internal Finishes & Flooring Flooring (approx. 120 m²): • Preparation of concrete substrates, including primer/moisture barrier • Installation of slip-resistant sports-grade vinyl or resin flooring • Hygienic coved skirting and wall upstands in wet areas Decoration: • Preparation of internal walls (approx. 350 m²) and ceilings (approx. 120 m²) • Redecoration using moisture-resistant, anti-mould coatings ________________________________________ 6.3 Shower Facilities • Formation of eight individual shower cubicles (four per changing room) • Waterproof composite partition panels and cubicle doors with privacy locks • Adaptation of existing hot and cold water feeds to minimise new pipework • Installation of shower valves, heads, and accessories (8 in plus 1 referee) • Inspection of shower gullies and channels for capacity and falls ________________________________________ 6.4 Mechanical & Electrical Services Lighting: • Removal of all fluorescent fittings • Installation of approximately 20 LED battens or panels • Full testing, commissioning, and certification Ventilation: • New mechanical extract system serving shower areas • Sized to achieve adequate air changes and control condensation Heating & Hot Water: • Replacement of inefficient electric heaters with high-efficiency convectors or infrared panels (2 units) • Replacement of the existing gas-fired water heater with a modern high-efficiency condensing unit, including new controls and insulation ________________________________________ 6.5 Optional Separate Quotation - Air Source Heat Pump (ASHP) Tenderers may submit a standalone optional quotation for an Air Source Heat Pump under the Boiler Upgrade Scheme (BUS). This must be entirely separate from refurbishment costs and include: • Separate scope of works • Separate programme • Separate cost breakdown showing gross cost, £7,500 BUS grant deduction, and net cost to the Parish Council The ASHP must be designed and installed by an MCS-certified installer. Contractors must support EPC requirements and BUS compliance. Full details are contained within a separate ASHP specification document. ________________________________________ 7. Mandatory Tender Submission Requirements All tenders must clearly include: • A detailed scope of works referencing this specification • A schedule of materials and energy-efficient products • A project programme with key milestones • A fully itemised cost breakdown A minimum 10% contingency allowance must be included. ________________________________________ 8. Tender Evaluation Tenders will be assessed using a Most Advantageous Tender (MAT) approach: • Price: 40% • Quality: 60% Quality will be evaluated against: • Understanding of the specification • Relevant experience • Technical competence • Programme and resources • Risk management, Health & Safety, and warranties Each criterion will be scored on a 1-5 performance scale. The contract will be awarded to the tender achieving the highest combined score. ________________________________________ 9. Information Sharing & Funding Compliance Tender information relating to refurbishment works will be shared with Staffordshire FA as part of grant assessment and audit. ASHP tender information (where submitted) will be shared with the BUS scheme administrator for grant compliance. All information will be handled in accordance with public procurement and data protection requirements.
⚠️

MANDATORY EXCLUSION GROUNDS

  • Failure to declare actual or potential conflicts of interest.

ELIGIBILITY REQUIREMENTS

  • Declare any actual or potential conflicts of interest, including financial interests relating to Tutbury Parish Council.
  • Declare any actual or potential conflicts of interest, including personal or business relationships with serving councillors or officers.
🔧

TECHNICAL CAPABILITY REQUIREMENTS

  • Be capable of performing all specified demolition and strip-out works.
  • Be capable of preparing concrete substrates, including primer/moisture barrier.
  • Be capable of installing slip-resistant sports-grade vinyl or resin flooring (approx. 120 m²).
  • Be capable of installing hygienic coved skirting and wall upstands in wet areas.
  • Be capable of preparing internal walls (approx. 350 m²) and ceilings (approx. 120 m²).
  • Be capable of redecorating using moisture-resistant, anti-mould coatings.
  • Be capable of forming eight individual shower cubicles (four per changing room).
  • Be capable of installing waterproof composite partition panels and cubicle doors with privacy locks.
  • Be capable of adapting existing hot and cold water feeds to minimise new pipework.
  • Be capable of installing shower valves, heads, and accessories (8 in plus 1 referee).
  • Be capable of inspecting shower gullies and channels for capacity and falls.
  • Be capable of removing all fluorescent lighting fittings.
  • Be capable of installing approximately 20 LED battens or panels.
  • Be capable of full testing, commissioning, and certification for lighting.
  • Be capable of installing a new mechanical extract system serving shower areas, sized for adequate air changes and condensation control.
  • Be capable of replacing inefficient electric heaters with high-efficiency convectors or infrared panels (2 units).
  • Be capable of replacing the existing gas-fired water heater with a modern high-efficiency condensing unit, including new controls and insulation.
  • Demonstrate understanding of the project specification.
  • Possess relevant experience in similar refurbishment projects.
  • Possess technical competence for the scope of works.
  • Detail resources allocated to the project.
  • Address risk management strategies for the project.
  • Address Health & Safety procedures for the project.
  • Provide details of warranties for works and materials.
  • Minimise disruption to football matches and training during works.
  • Manage access to the car park carefully during works.
  • Programme works outside the main football season where possible.
  • (Optional ASHP) If submitting an ASHP quotation, the ASHP must be designed and installed by an MCS-certified installer.
  • (Optional ASHP) If submitting an ASHP quotation, the contractor must support EPC requirements and BUS compliance.
💰

FINANCIAL REQUIREMENTS

  • Include a minimum 10% contingency allowance in the cost breakdown.
  • (Optional ASHP) If submitting an ASHP quotation, provide a separate cost breakdown showing gross cost, £7,500 BUS grant deduction, and net cost to the Parish Council.
📋

SUBMISSION REQUIREMENTS

  • Submit tenders electronically by email.
  • Submit tenders by 2026-02-03 17:00:00.
  • Provide a detailed programme showing sequencing and access management.
  • Include a detailed scope of works referencing this specification.
  • Include a schedule of materials and energy-efficient products.
  • Include a project programme with key milestones.
  • Include a fully itemised cost breakdown.
  • (Optional ASHP) If submitting an ASHP quotation, it must be standalone and entirely separate from refurbishment costs.
  • (Optional ASHP) If submitting an ASHP quotation, it must include a separate scope of works.
  • (Optional ASHP) If submitting an ASHP quotation, it must include a separate programme.

Requirements Preview

Sign up to view complete requirements and analysis

AI-powered requirement analysis
Complete compliance breakdown
Strategic bidding insights
Instant eligibility check

No credit card required • Setup in 2 minutes

PDF
Official PDF Version
PDF001136-2026_official.pdf
Summary:
This document outlines the detailed scope of works, submission requirements, evaluation criteria, and payment terms for the refurbishment of football changing rooms at Cornmill Lane, Tutbury, including an optional Air Source Heat Pump quotation.

Documents Preview

Sign up to view document summaries and analysis

AI document summaries
Key requirement extraction
Risk & compliance alerts
Strategic document insights

No credit card required • Setup in 2 minutes

66
Good

Tender Quality Score

This tender provides a detailed scope of works with a strong focus on sustainability, but is significantly hampered by the critical absence of explicit evaluation criteria, which compromises transparency and fairness.

Score Breakdown

Legal Compliance75/100

The tender clearly defines the procedure type and CPV codes, and the 16-day submission period is technically reasonable. However, the missing publication date and the lack of explicit, detailed evaluation criteria are notable compliance weaknesses regarding transparency and equal treatment.

Missing publication/reveal date.
Lack of explicit, detailed evaluation criteria.
Clarity60/100

The project objective, scope of works, and technical requirements are exceptionally clear and well-detailed. However, the complete absence of specified evaluation criteria is a critical flaw, making it impossible for bidders to understand how their proposals will be judged.

No explicit evaluation criteria or weighting provided.
Completeness65/100

Most essential information, including basic details, deadlines, value, and duration, is present. The scope of works and requirements are well-defined. However, the lack of explicit evaluation criteria and the mention of a 'separate ASHP specification document' not provided or summarized indicate significant omissions.

No explicit evaluation criteria.
Mention of 'separate ASHP specification document' not provided/summarized.
Fairness50/100

The tender provides a reasonable preparation time and generic technical requirements. However, the complete lack of transparent and objective evaluation criteria is a severe fairness issue, as it introduces subjectivity into the award decision. Email submission, while electronic, is less structured than a dedicated e-procurement portal.

No objective and transparent evaluation criteria.
Email submission, while electronic, is less structured than a dedicated e-procurement platform.
Practicality70/100

Electronic submission via email is supported, and financial details, contract duration, and start date are clearly specified. However, the absence of a direct document URL is a practical drawback, requiring bidders to seek out the full tender documents elsewhere.

No direct document URL provided.
Data Consistency75/100

Core dates and project constraints are logical and consistent. However, there are minor inconsistencies such as 'Value Classified: Yes' contradicting the disclosed value, the discrepancy between '4 total' documents and only one detailed, and the missing publication date making the '30 days of publication' statement ambiguous.

'Value Classified: Yes' contradicts disclosed value.
'4 total' documents mentioned, but only 1 detailed.
Sustainability85/100

The tender demonstrates a strong commitment to environmental sustainability and energy efficiency, with mandatory upgrades (LEDs, efficient heating/hot water) and an optional Air Source Heat Pump (ASHP) quotation. This includes requirements for energy-efficient products. However, explicit social criteria are not included.

No explicit social criteria.

Strengths

Detailed and clear scope of works and technical requirements.
Strong focus on environmental sustainability and energy efficiency, including an optional ASHP.
Clear financial information, payment terms, and contract timeline.
Electronic submission supported (via email).
No indication of requirements tailored to a specific company.

Concerns

Critical lack of explicit, detailed evaluation criteria, compromising transparency and fairness.
Missing publication/reveal date, creating ambiguity around the actual tender period.
Potentially missing tender documents (ASHP specification, other documents implied by '4 total').
Basic email submission instead of a structured e-procurement platform.
No explicit social criteria.

Recommendations

1. Immediately publish clear, objective, and detailed evaluation criteria with specific weightings for all assessment aspects.
2. Ensure all relevant tender documents, especially the 'separate ASHP specification document,' are made available and easily accessible, ideally via a direct URL.
3. Clarify the tender publication date to ensure transparency regarding the full bidding period.

AI Scoring Preview

Sign up to view complete requirements and analysis

Complete quality score analysis
Detailed sub-score breakdown
Strengths & concerns insights
Strategic recommendations

No credit card required • Setup in 2 minutes

Generate DocumentsReview Documents
B
Tender Quality Score
66/ 100 · Good

Tender Assistant

Ask me anything about this tender

Tender Assistant

Hello! I'm your AI assistant for this tender. I can help you understand requirements, deadlines, eligibility criteria, and provide strategic insights.

What are the main requirements?
When is the deadline?
Who is eligible to bid?

No credit card required

Setup in 2 minutes

Save with Notes