Skip to main content
Atgal į konkursus

Waste Management DPS

Atviras
Galutinis terminas
Liko 947 dienų
Spalis 29, 2028
Informacija apie sutartį
Kategorija
Restricted Procedure
Nuoroda
023149-2021
Vertė
£5,000,000
Vieta
North East England, Jungtinė Karalystė
Paskelbta
Kovas 19, 2026
CPV kodas
Projekto grafikas

Konkursas paskelbtas

Rugsėjis 17, 2021

Klausimų pateikimo terminas

Spalis 22, 2028

Pasiūlymų pateikimo terminas

Spalis 29, 2028

Pirkėjo analitikaPRO
🔒
Atrakinkite pirkėjo analitiką
Peržiūrėkite išlaidų modelius, pageidaujamas procedūras ir kita.
Atnaujinti į Professional →
Biudžetas
£5,000,000
Trukmė
84 mėnesių
Vieta
North East England
Tipas
Restricted Procedure
70
Kokybės įvertinimas/100
Gerai

Originalus konkurso aprašymas

Thirteen Housing Group Limited (THG) are looking to improve their waste management services and environmental footprint. As part of our strategy, we have opened our first Thirteen Recycling Centre (TRC) based in Billingham to manage waste being disposed from services carried out within the north and west of the business area and we are currently working towards opening a second centre within the Middlesbrough area to cover waste being disposed of from within the south of the business area. We also have properties based outside the Tees Valley so it is likely that future requirements could arise beyond this area.
Žaliasis pirkimas

Rizikos analizė

Prisijunkite, kad galėtumėte naudoti rizikos analizę.

Prisijungti

Laimėjimo strategija

Prisijunkite, kad galėtumėte naudoti laimėjimo strategijos rekomendacijas.

Prisijungti

Konkurentai

Atnaujinkite, kad matytumėte, kurios įmonės greičiausiai pateiks pasiūlymą šiam konkursui, remiantis istoriniais viešųjų pirkimų duomenimis.

Prisijungti

Reikalavimai ir kvalifikacija

17 reikalavimų 5 kategorijose

Pateikimas (3)
Privalomas (1)
Atitiktis (6)
Techninis (5)
Finansinis (2)
SUBMISSION REQUIREMENTS3
--Submit a bid by the deadline: 2028-10-29 12:00:00.
--Access procurement documents via in-tendhost.
--Participate in the Restricted procurement process, which typically involves an initial submission for pre-qualification followed by a full tender submission if invited.
MANDATORY EXCLUSION GROUNDS1
--No specific mandatory exclusion grounds are detailed in the provided information.
ELIGIBILITY REQUIREMENTS6
--Operate within the refuse and waste related services sector.
--Be capable of providing waste management services for Thirteen Housing Group properties.
--Be capable of covering the north and west business areas (Billingham TRC).
TECHNICAL CAPABILITY REQUIREMENTS5
--Ability to improve waste management services.
--Ability to contribute to Thirteen Housing Group's environmental footprint improvement.
--Capability to manage waste being disposed from services carried out.
FINANCIAL REQUIREMENTS2
--Ability to deliver services under a contract with an estimated value of 5,000,000.0 EUR.
--Ability to sustain operations for a contract duration of 84 months.

Reikalavimų peržiūra

Prisiregistruokite, kad peržiūrėtumėte visus reikalavimus ir analizę

Dokumentai

Yra 1 dokumentų su AI santraukomis

Official PDF VersionPDF
023149-2021_official.pdf

This is a contract notice for Thirteen Housing Group's Waste Management DPS, valued at £5M, seeking providers to improve waste services and environmental footprint across multiple lots, with procurement documents available via in-tendhost.

Dokumentų peržiūra

Prisiregistruokite, kad peržiūrėtumėte dokumentų santraukas ir analizę

70
Gerai

Konkurso kokybės įvertinimas

This tender outlines a strategic initiative for waste management improvement with a clear geographical scope and environmental objectives, but is critically hampered by the complete absence of tender documents and detailed evaluation criteria.

Įvertinimo detalės

Atitiktis teisės aktams100/100

Legal compliance is severely compromised by the absence of mandatory exclusion grounds and the complete lack of tender documents, making it impossible to verify adherence to procurement regulations. The inconsistency between 'Restricted' procedure and 'DPS' in the title also creates ambiguity.

Missing mandatory exclusion grounds
Absence of comprehensive tender documents
Aiškumas40/100

The tender's description and high-level requirements are generally clear regarding the scope and objectives. However, the complete absence of detailed tender documents means that specific requirements, evaluation criteria, and terms are entirely unclear to potential bidders.

Lack of detailed specifications and requirements due to missing documents
Ambiguity regarding 'multiple lots' without further detail
Užbaigtumas83/100

The tender is critically incomplete. The complete absence of any attached documents, including detailed specifications, terms and conditions, and evaluation criteria, renders it impossible for bidders to prepare a compliant and competitive offer. Mandatory exclusion grounds are also missing.

Complete absence of all tender documents
Missing detailed evaluation criteria
Sąžiningumas80/100

Without comprehensive tender documents, especially detailed evaluation criteria and specifications, assessing the fairness of the procurement process is impossible. The 'Restricted' procedure inherently limits competition, but this is a standard approach. The requirement to integrate with TRCs is specific but appears operationally justified.

Inability to assess fairness due to missing evaluation criteria and full documentation
Praktiškumas40/100

From the contracting authority's perspective, the tender outlines a practical approach to waste management with defined geographical areas and operational integration points. However, from a bidder's perspective, the complete lack of tender documents makes participation impractical and impossible.

Impractical for bidders to respond without any tender documents
Duomenų nuoseklumas100/100

There is an inconsistency between the stated 'Restricted' procedure and the 'DPS' (Dynamic Purchasing System) mentioned in the title, which could confuse potential bidders about the nature of the procurement. The automated check's flag of 'No e-submission' contradicts the instruction to 'Access procurement documents via in-tendhost,' which is an e-procurement platform.

Inconsistency between 'Restricted' procedure and 'DPS' in the tender title
Contradiction regarding e-submission capability (automated check vs. 'in-tendhost' platform)
Tvarumas0/100

The tender explicitly states an objective to improve the 'environmental footprint,' indicating a commitment to sustainability. However, the extracted requirements do not detail specific, measurable green or social criteria, making it unclear how this objective will be evaluated or enforced.

Lack of specific, measurable green procurement criteria
Absence of social criteria

Privalumai

Clear strategic objective to improve waste management and environmental footprint
Well-defined geographical scope with potential for future expansion
Transparent estimated value and contract duration
Use of a recognized CPV code
Indication of a structured procurement process (Restricted procedure, pre-qualification implied)

Problemos

Critical absence of all tender documents (specifications, evaluation criteria, contract draft)
Missing mandatory exclusion grounds, a fundamental legal requirement
Lack of detailed evaluation criteria, hindering transparency and fair assessment
Inconsistency between 'Restricted' procedure and 'DPS' in the tender title
Absence of specific, measurable sustainability and social criteria despite stated environmental objectives

Rekomendacijos

1. Immediately publish all comprehensive tender documents, including detailed specifications, terms and conditions, evaluation criteria, and the draft contract.
2. Clearly define and publish all mandatory exclusion grounds as per relevant procurement regulations.
3. Clarify the procurement procedure, resolving the inconsistency between 'Restricted' and 'DPS' in the title, and integrate specific, measurable sustainability targets and social criteria into the tender documents and evaluation framework.

AI įvertinimo peržiūra

Prisiregistruokite, kad peržiūrėtumėte visus reikalavimus ir analizę

Išsami kokybės balo analizė
Detali sub-balų analizė
Privalumų ir trūkumų įžvalgos
Strateginės rekomendacijos

Nereikia kreditinės kortelės • Sąranka per 2 minutes

Įtraukti į „Pipeline“